References
Projects realized by East Construction since 1985: In 32 years, East has designed and realized more than 650 000 m2 PRS wall systems.
Bursa Integrated Healthcare Campus | 7 500 m2 (13,6 m) | Rönesans Construction | 2018 |
Mugla Yatagan Technical Professions High School | 1 500 m2 (14,4 m) | Özgür Atatürk Duru 4K | 2018 |
Afyon Karahisar Erkmen Bridge and Crossroads | 3 400 m2 (8,0 m) | Bergiz AŞ Astro Üst Yapı | 2018 |
Mugla Sitki Kocman University Crossroads Bridge Abutments | 1 800 m2 (12,0 m) | Duvpan Construction | 2017 |
Bursa Municipality Stadium Crossroads Bridge Abutments | 2 800 m2 (12,0 m) | Metsa Group Construction | 2017 |
Kardelen Village Construction Cooperative Environmental Arrangement | 3 000 m2 (14,4 m) | Kardelen Village Cooperative | 2017 |
Bursa Integrated Healthcare Campus Construction | 5 400 m2 (12,0 m) | Rönesans Holding | 2017 |
Kırşehir - Akpınar Kavşağı Road Crossings | 8 800 m2 (10,5 m) | Bergiz A.Ş.- HMP A.Ş. İş Ortaklığı | 2016 |
Yasham Duvar Kağıtları Boya ve Kimya Industrial Zone | 5 000 m2 (11,2 m) | Yasham Duvar Kağıtları Boya ve Kimya Sanayi A.Ş. | 2015 |
Irak - Baharke Road Crossings | 7 500 m2 (8 m) | Gürbağ İnşaat A.Ş | 2016 |
Ankara –T urgut Özal University | 1 700 m2 (17,6 m) | Turgut Özal Üniversitesi | 2015 |
Ankara – Avcı Gas Station | 1 500 m2 (15 m) | Avcı Petrol San. Tic. Ltd. Şti. | 2015 |
Kışladağ Gold Mine | 3,000 m2 (24 m) | Tüprağ Metal Madencilik | 2014 |
Bodrum Highway | 3,000 m2 (10m) | East Construction | in progress ... |
Kırşehir - Akpınar Road Crossings | 8,800 m2 (11m) | Bergiz and HMP Companies Joint Venture | 2015 |
Irak - Baharke Road Crossings | 7,500 m2 (8m) | Gürbağ Construction | 2015 |
Yasham Painting and Chemicals Facilities | 5,000 m2 (11m) | Yasham Painting and Chemicals Company | 2015 |
Ankara Avcı Oil Station | 1,500 m2 (15m) | Avcı Oil and Industries Ltd. | 2015 |
Turgut Özal University | 1,700 m2 (17m) | Turgut Özal University | 2015 |
Kışladağ Gold Mine | 3,000 m2 (25m) | TUPRAG Mining and Metal Company (Eldorado Gold) | 2014 |
İzmir Turgutlu Ansızca Crossroad | 6,000 m2 (8m) | Öngün Construction | 2014 |
Ereğli Public Hospital | 4,200 m2 (17m) | Akay Construction | 2014 |
Artvin Hydroelectric Plant Retaining Walls | 15.000 m2 (25m) | ESTA / Doğus | 2013 |
Antalya/Serik Public Hospital Retaining Walls | 1.500 m2 (15m) | Teraş – Terzioğulları Construction Co. | 2013 |
Ağrı Airport Terminal Retaining Walls | 10.200 m2 (23m) | DHMI Authority - Alfen / Doğusan Joint Venture) | 2013 |
Vialand Shopping and Entertainment Centre Retaining Walls | 2.900 m2 (12m) | Tekno / Maccaferri Construction Co. | 2013 |
Uşak-Afyon Karahisar Highway, Antalya Crossing Retaining Walls | 4.700 m2 (10m) | Lizor Construction Co. | 2013 |
Düzce University Retaining Walls | 4.500 m2 (7m) | Tekbudak Construction Co. | 2012 |
Gebze Coal Storage Plant Retaining Walls | 4.100 m2 (8m) | Tekno / Macceferri Construction Co. | 2012 |
Bingöl Airport Retaining Walls | 3.500 m2 (8m) | Tekbudak / Yek Joint Venture | 2012 |
Başkent University Retaining Walls | 6.000 m2 (8m) | Geotaş Construction Co. | 2012 |
Gökova – Marmaris Highway Retaining Walls | 12.000 m2 (22m) | KGM 2. Area Directory / Kolin Construction Co. | 2012 |
Sivas D.S.I Road Crossing Bridge Abutments | 7.000 m2 (10m) | Highway State Agency 16. District Directorate | 2011 |
Cihanbeyli Industrial Zone, Road Crossing Bridge Abutments and Retaining Walls | 6.400 m2 (8m) | Highway State Agency 3. District Directorate | 2011 |
Bekdiğin Road Crossing and Bridge Abutments and Retaining Walls | 3.900 m2 (10m) | Highway State Agency 7. District Directorate | 2010 |
The Post Office Central Management Building (TOKI) Retaining Walls | 1.400 m2 (7m) | TOKI | 2010 |
Kiptaş Nish Islands Residential Buildings Retaining Walls | 25.000 m2 (15m) | KIPTAŞ / Özyazıcı Construction Co. | 2010 |
L'Ist Istinye Residences Ring Roads Retaining Walls | 2.600 m2 (14m) | Öztaş Construction Co. | 2010 |
Efemçukuru Gold Mine Retaining Walls | 3.500 m2 (13m) | Tüprağ Metal Mining Company | 2009 |
Narcity Primary School Ring Roads Retaining Walls | 1.550 m2 (10m) | Tepe Construction Co. | 2009 |
Bozüyük Ringroad and Bilecik Road Bridge Abutments and Retaining Walls | 25.000 m2 (12m) | Highway State Agency - 14. District Directorate (MÖN Constr. Co.) | 2009 |
Kayseri Mimar Sinan Road Crossing Bridge Abutments and Retaining Walls | 12.000 m2 (15m) | Kayseri Municipality Highway State Agency 16. District Directorate (SNH / Yapsan Joint Venture) | 2009 |
Sinop Boyabat Highway Retaining Walls | 3.200 m2 (12m) | Highway State Agency - 7. District Directorate (MÖN Constr. Co.) | 2008 |
Halkalı Residence Junction Roads Retaining Walls | 2.400 m2 (10m) | TOKİ (Tisan Construction Co.) | 2008 |
Budva (Karadağ) City Road Retaining Walls | 600 m2 (10m) | Budva Municipality - Karadağ | 2008 |
Istanbul Bahçeşehir Ispartakule and Junction Roads Retaining Walls | 2.400 m2 (10m) | TOKİ – Emlak Residence Co. | 2008 |
Altınşehir Square, Ebabil Highway Road Crossings Retaining Walls | 2.800 m2 (10m) | Istanbul Municipality | 2008 |
Maltepe Başıbüyük Residences Retaining Walls | 1.200 m2 (14m) | KIPTAŞ (Özyazıcı Construction Co.) | 2008 |
Sedef Tersanesi Tuzla Industrial Road Highway Phase II Retaining Walls | 3.700 m2 (14m) | Sedef Gemi Construction Co. | 2008 |
Uşak Road Crossings Retaining Walls | 1.100 m2 (14m) | Uşak Municipality (USAŞ Construction Co.) | 2007 |
Pendik South Road Crossing and Mostar Flyover Retaining Walls | 550 m2 (9m) | Istanbul Municipality | 2007 |
Gölcük – Yeniköy Road Crossing Flyovers Retaining Walls | 1.500 m2 (8m) | Autoport Port Authority Company | 2007 |
Eskişehir – Sümer Road Crossing Retaining Walls | 1.300 m2 (9m) | Highway State Agency 4. District Directorate | 2007 |
Kumburgaz Road Crossing Retaining Walls | 3.800 m2 (9m) | Istanbul Municipality | 2007 |
Şile Yolu Kemerdere Highway - Sarıgazi Road Crossing Retaining Walls | 1.800 m2 (9m) | Istanbul Municipality | 2007 |
Kiptaş – Narcity Road Crossing Flyover Abutments | 1.600 m2 (9m) | Istanbul Municipality | 2007 |
Kayseri North Ring Road - DDY Flyover Abutments | 1.200 m2 (9m) | Highway State Agency 6. District Directorate | 2007 |
Başiskele Road Crossing Fylover Abutments | 1.600 m2 (8m) | Kocaeli Municipality | 2007 |
Başıbüyük Süreyyapaşa Highway Retaining Walls | 9.700 m2 (14m) | Istanbul Municipality | 2007 |
Mekece – Adapazarı Highway – Phase II Retaining Walls | 2.300 m2 (11m) | Highway State Agency 1. District Directorate | 2007 |
Eskişehir Neo Shopping Center - Underpass Precast Facades | 1.500 m2 | Koray Construction Co. | 2006 |
Altınşehir Square, Güneşli Road Crossing Retaining Walls | 2.000 m2 (10m) | Istanbul Municipality | 2006 |
Bilecik Police Academy Ring Roads Retaining Walls | 1.300 m2 (8m) | General Directorate of Security | 2006 |
Maltepe – Büyükyalı E5 Road Crossing Retaining Walls | 3.000 m2 (11m) | Istanbul Municipality | 2006 |
Maltepe – Başıbüyük Büyükbakkal Highway Retaining Walls | 3.500 m2 (12m) | Istanbul Municipality | 2006 |
Pendik E5 Road Crossing South Underpass Retaining Walls | 900 m2 (10m) | Istanbul Municipality | 2006 |
Iznik Ring Road Highway Bridge Abutments and Retaining Walls | 1.500 m2 (10m) | Iznik District Government | 2006 |
Kartal – TEM Road Crossing, Balıkesir Highway Precast Concrete Facade | 500 m2 | Istanbul Municipality | 2006 |
Kartal – TEM Road Crossing, Balıkesir Highway Retaining Walls | 900 m2 (7m) | Istanbul Municipality | 2006 |
Maltepe Başıbüyük Büyükbakkal Highway Retaining Walls and Bridge Abutments | 7.000 m2 (15m) | Istanbul Municipality | 2006 |
Lineadekor Gebze Plant Retaining Walls | 2.500 m2 (9m) | Ahşap Dekor Ürünleri Company | 2006 |
Avcılar Road Crossing and University Underpass Retaining Walls | 8.000 m2 | Istanbul Municipality | 2006 |
Eski Başisleke Road Crossings Retaining Walls | 2.000 m2 (8m) | Kocaeli Municipality | 2005 |
Kışladağ Gold Mine Retaining Walls | 1.500 m2 (23m) | Tüprağ Metal and Mining | 2005 |
Avcılar Road Crossing and University Underpass Retaining Walls | 2.200 m2 (9m) | Istanbul Municipality | 2005 |
Hacı Kasım Highway Junction Road Underpass Retaining Walls | 1.000 m2 (7m) | Istanbul Municipality | 2005 |
Araklı – Iyidere Black Sea Coastal Highway Retaining Walls | 35.000 m2 (10m) | Highway State Agency 10. District Directorate | 2005 |
Miracle Otel – Antalya Access Road Retaining Walls | 1.200 m2 (7m) | MÖN Construction | 2004 |
Yıldız Kışla – Barbaros Road Crossing Bridge Abutments | 5.500 m2 | Istanbul Municipality | 2004 |
Kartal Yakacık Spor Street Retaining Walls | 1.000 m2 (7m) | Istanbul Municipality | 2004 |
Tuzla Aydınlı Highway and Icmeler Road Crossing | 1.200 m2 (11m) | Istanbul Municipality | 2003 |
Izmir – Turgutlu Cross Road, Manisa Highway | 5.200 m2 (11m) | Highway State Agency 2. District Directorate | 2002 |
Ankara Highway, Aydınlı – Içmeler Road Retaining Walls | 2.000 m2 (8m) | Istanbul Municipality | 2002 |
Yıldızeli – Sivas Hafik Railway Retaining Walls | 620 m2 (8m) | Highway State Agency 16. District Directorate | 2001 |
Istinye Darüşşafaka Road Crossing Retaining Walls | 5.500 m2 (8m) | Istanbul Municipality | 2000 |
Tarsus Crossing – Mersin Highway Retaining Walls | 1.000 m2 (10m) | Highway State Agency 5. District Directorate | 2000 |
D.D.Y. Flyovers and D100 Footbridges Retaining Walls | 300 m2 (9m) | Kartal Municipality | 1999 |
Tuzla Aydınlı Road and Icmeler Crossing Retaining Walls | 3.500 m2 (11m) | Istanbul Municipality | 1999 |
Merkez Çelik Plant Peripherical Roads Retaining Walls | 4.500 m2 (11m) | Merkez Çelik Company | 1998 |
Beykoz - Dedeoğlu – Sazlıdere -Soğuksu Junction Roads Retaining Walls | 1.450 m2 (11m) | Istanbul Municipality | 1998 |
Istinye C Road Büyükdere Street Phase I Retaining Walls | 5.500 m2 (10m) | Istanbul Municipality | 1998 |
Bakırköy Fildamı Coastal Road Retaining Walls | 200 m2 (5m) | Istanbul Municipality | 1998 |
Bosna Street– Küçüksu Road Crossing Retaining Walls | 7.500 m2 (8m) | Istanbul Municipality | 1998 |
T.S.K. Rehabilitation and Health Centre Retaining Walls | 10.700 m2 (14m) | M.S.B. Construction Co. | 1998 |
Bayrampaşa Bridge ve Davutpaşa Road Crossing Retaining Walls | 2.300 m2 (8m) | Istanbul Municipality | 1997 |
Rahmanlar – E5 Junction Road Retaining Walls | 2.600 m2 (8m) | Istanbul Municipality | 1997 |
Toprakkale – Iskenderun Highway Retaining Wals | 15.000 m2 (26m) | Highway State Agency | 1997 |
Sarıyer – Istinye Junction Road Retaining Walls | 7.000 m2 (14m) | Istanbul Municipality | 1997 |
Kağıthane Başak Residences Retaining Walls | 1.200 m2 (14m) | Istanbul Municipality | 1997 |
Güngören Crossing Approach Road Retaining Walls | 1.000 m2 (7m) | Istanbul Municipality | 1997 |
Bozkaya Road Crossing Approach Road Retaining Walls | 1.200 m2 (7m) | İzmir Municipality | 1996 |
Yerköy Flyover Retaining Walls | 4.200 m2 (9 m) | Highway State Agency | 1996 |
Bahçeşehir Residences Retaining Walls | 750 m2 (8m) | Emlak Bank | 1995 |
Tuzlu Çayır Road Retaining Walls | 4.500 m2 (12m) | Ankara Municipality | 1995 |
TAG Highway Retaining Walls | 23.500 m2 (30m) | Highway State Agency | 1994-1998 |
Keçiören Bridge Abutments and Retaining Walls | 1.500 m2 (8m) | Keçiören Municipality | 1994 |
Üzümcü Road Retaining Walls | 2.300 m2 (22m) | Ankara Municipality | 1993 |
Tanyeli Street Retaining Walls | 2.300 m2 (11m) | Ankara Municipality | 1991 |
Koru Mar Hotel Retaining Walls | 1.200 m2 (12m) | Koru Mar Hotel | 1988 |
2. Istanbul Bridge Periphery and Connection Roads Retaining Walls | 60.000 m2 (20m) | Highway State Agency | 1987-1989 |
Elmadağ Bridge Approach Road Retaining Walls | 4.400 m2 (7m) | Highway State Agency 4. District Directorate | 1987 |